Solar jobs die between people. Not on Capo.
Site survey to PTO with one owner and one clock. The board tells you who’s holding each job, for how long, and what they owe next — residential and commercial.
| Job | Owner | Days | ||
|---|---|---|---|---|
1142 Camino Salazar RES SOLAR | Marcus T. | NEM3 interconnection | File application with SDG&E | 6d 23:59:50 |
4200 Whitfield Bldg C COMM SOLAR | Project mgr (role) | PTO application | Submit after final inspection | 4d |
617 Nguyen Way RES SOLAR | Priya K. | MPU coordination | Schedule panel upgrade | 2d |
9051 Reyes Terrace RES SOLAR | Jess L. | LightReach JCO | Upload JCO photo package | 3d |
330 Esposito Hgts RES SOLAR | Tariq B. | Design approved | Send contract for signature | 1d |
1207 Mercado Comm COMM SOLAR | Lena F. | Utility coordination | Confirm transformer capacity | 5d |
One owner from site survey to PTO.
No job sits in a gap between the closer, the designer, the PM, and the interconnection coordinator. There’s always exactly one name on it and a clock running — green under three days, amber at three, red at seven.
Tell it the financer and the city. It builds the list.
Residential solar, LightReach (or GoodLeap, Palmetto), El Cajon, battery, MPU, SDG&E. Capo reads all of it off the job and stacks the work orders — NEM3 interconnection, MPU coordination, JCO photo package, permit submittal — tagged to where they came from. You confirm. You re-enter nothing.
Interconnection and PTO without the chase.
The pipeline runs to PTO and soft-gates warn you when financing isn’t funded yet — then get out of your way. Nobody files NEM3 twice; nobody forgets the PTO application is waiting on final inspection.
- Lead
- Design
- 3PermitGate
- 4Install
- 5Inspect
- 6PTO
Soft gate · financing
Financing not yet funded — proceed anyway?
GoodLeap approval pending · gate clears when funded
Every serial caught on the install. Not on a callback.
Guided shoots walk the crew through the JCO package section by section, capturing inverter, battery, and meter serials into the as-built register on the spot — for warranty and financer verification, the first time.
| Type | Model | Serial | Location |
|---|---|---|---|
| INVERTER | IQ8M-72 | 8F3K-22910-A | Garage wallVERIFIED |
| BATTERY | 5P-13.5 | 9KL2-55821 | GarageVERIFIED |
| METER | SDG&E | — | ExteriorPENDING |
Each captured serial writes a project_equipment record · warranty + financer verification
Aurora and OpenSolar, synced.
Run your solar
board.
Residential or commercial — tell us your financers and AHJs and we’ll load them onto the board.